Cart(0)
Pet Health Care, Smart Gadgets & Training Tools | Deworming Tablets, GPS Pet Tracker, No-Pull Harness – PawTech
Pet Health Care, Smart Gadgets & Training Tools | Deworming Tablets, GPS Pet Tracker, No-Pull Harness – PawTech Pet Health Care, Smart Gadgets & Training Tools | Deworming Tablets, GPS Pet Tracker, No-Pull Harness – PawTech
Home smart pet gadgets Smart Pet Camera
Premium NFC & QR Code Smart Dog ID Tag - Easy Scanning, Instant Profile Access, Real-Time Location Alerts(Black Paw)
Premium NFC & QR Code Smart Dog ID Tag - Easy Scanning, Instant Profile Access, Real-Time Location Alerts(Black Paw)
Color:
  • Black Paw
  • Blue Paw
  • Gold Paw
  • Green Paw
  • Peach Paw
  • Pink Paw
  • Pink Tiara
  • Rose Gold Paw
  • Silver Paw

$ 12.00

$ 12.00

Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

  • EASY IDENTIFICATION: Scan the NFC, QR tag or access the profile URL on the tag for quick retrieval of your dog's ID and emergency contact information.
  • PERSONALIZED PET PROFILE: Linked to the smart ID tag, it includes your dog's name, description, owner contacts, medical data and vet info, and scan Google location map.
  • INSTANT SCAN ALERTS: Get real-time email notifications with scan details and location, plus a pinpoint map on your profile page whenever someone scans your dog's tag. Quickly locate your pet if they go missing.
  • BUILT TO LAST: Crafted durable, non-toxic, and waterproof, this Pet ID tag is designed to withstand the elements and stand the test of time. It ensures long-term use and securely fits on your pet's collar.
  • RELIABLE CHOICE: Pet Dwelling is an American company offering pet safety, security, advanced features, excellent service, and affordable pricing. All data is stored in the USA and protected by US data privacy laws.




  • Is Discontinued By Manufacturer : No
  • Product Dimensions : 1.14 x 0.06 x 1.26 inches; 0.35 ounces
  • Date First Available : December 30, 2016
  • Manufacturer : Pet Dwelling
  • Country of Origin : China
You May Also Like
Gigwi Flappy Bird Cat Toy For Indoor Cats, Rechargeable Lifelike Sandpiper Interactive Flapping Bird Cat Toy Tweet, Flapping Wings & Lively Chirping, Catnip Toys For Kitten, Touch Activated (Prince)
Gigwi Flappy Bird Cat Toy For Indoor Cats, Rechargeable Lifelike Sandpiper Interactive Flapping Bird Cat Toy Tweet, Flapping Wings & Lively Chirping, Catnip Toys For Kitten, Touch Activated (Prince)

$ 9.00

pelzbarn Cooling Dog Bed 2.0 New Summer Dog & Cat Cooling Mat
pelzbarn Cooling Dog Bed 2.0 New Summer Dog & Cat Cooling Mat

$ 76.00

Himmy XL Pet Wipes for Dogs and Cats  18 x 30 Bath Wipes for Cleaning, Deodorizing, Conditioning, Anti-Itch Grooming, Wet Dog Wipes for Paws, Butt, Ear, Eye, Face Whole Body Lavender
Himmy XL Pet Wipes for Dogs and Cats 18 x 30 Bath Wipes for Cleaning, Deodorizing, Conditioning, Anti-Itch Grooming, Wet Dog Wipes for Paws, Butt, Ear, Eye, Face Whole Body Lavender

$ 17.00

Life Protection Formula Adult Dry Dog Food, Lamb & Brown Rice, 15 Lbs, with Essential Proteins and Carbs for Energy Needs and Omega-3 & 6 Fatty Acids
Life Protection Formula Adult Dry Dog Food, Lamb & Brown Rice, 15 Lbs, with Essential Proteins and Carbs for Energy Needs and Omega-3 & 6 Fatty Acids

$ 97.00

WAYUTO Long Sleeve Silicone Grooming Gloves - Cat & Dog Massaging, Hair Removal, Bathing, Shampoo Gloves for Kitchen, Bathroom and Pet Shop Use - Blue
WAYUTO Long Sleeve Silicone Grooming Gloves - Cat & Dog Massaging, Hair Removal, Bathing, Shampoo Gloves for Kitchen, Bathroom and Pet Shop Use - Blue

$ 12.00

Cat Toys, Flapping Wings Blue-Bird, No Flying, Chirping Bird Interactive Catnip Toy for Kitten or Small Dogs, Touch Activated, Rechargeable
Cat Toys, Flapping Wings Blue-Bird, No Flying, Chirping Bird Interactive Catnip Toy for Kitten or Small Dogs, Touch Activated, Rechargeable

$ 25.00

Pet MD - Canine Tabs Plus 365 Count - Advanced Multivitamins for Dogs - Natural Daily Vitamin and Mineral Nutritional Supplement - Liver Flavored Chewable Tablets
Pet MD - Canine Tabs Plus 365 Count - Advanced Multivitamins for Dogs - Natural Daily Vitamin and Mineral Nutritional Supplement - Liver Flavored Chewable Tablets

$ 37.00

Potaroma Cat Toys Flapping Bird (No Flying), Lifelike Sandpiper Chirp Tweet, Rechargeable Touch Activated Kitten Toy Interactive Cat Exercise Toys for All Breeds Cat Kicker Catnip Toys 4.0"
Potaroma Cat Toys Flapping Bird (No Flying), Lifelike Sandpiper Chirp Tweet, Rechargeable Touch Activated Kitten Toy Interactive Cat Exercise Toys for All Breeds Cat Kicker Catnip Toys 4.0"

$ 15.00

lynxking Slip Lead Dog Leash Reflective, Heavy Duty Comfortable Strong Rope Lead for Large, Medium Dogs, No Pull Pet Training (Light Blue, Large 1/2in x 6ft-Slip Lead)
lynxking Slip Lead Dog Leash Reflective, Heavy Duty Comfortable Strong Rope Lead for Large, Medium Dogs, No Pull Pet Training (Light Blue, Large 1/2in x 6ft-Slip Lead)

$ 12.00

25 Pack Dog Vaccines Large Records Tri Fold Dog Health Records Book and Recommendations Puppy Vaccination Shot Booklets for Pet Supplies Home
25 Pack Dog Vaccines Large Records Tri Fold Dog Health Records Book and Recommendations Puppy Vaccination Shot Booklets for Pet Supplies Home

$ 9.00

Unavailable
Cart
Pet Health Care, Smart Gadgets & Training Tools | Deworming Tablets, GPS Pet Tracker, No-Pull Harness – PawTech
Your cart is currently empty.